Originally constructed in 1990, the Arizona Cardinals training facility was designed to stand at the forefront of the sustainability movement.  This extremely forward thinking mentality and future-oriented approach helped craft the 96,000 sq ft, Tempe, Arizona center.  Outfitted with ample natural lighting to reduce the need for artificial light and ventilation utilizing moist air current created by outdoor irrigation, the facility dramatically reduced its need for electricity throughout the day.  In addition, a 300′ wall of terracotta chimney flue tile protects the floor to ceiling glass from the harsh west sun, keeping the facility cooler.

In 2015, the entire facility received upgrades to adapt it to improved use of state of the art technology, as well as enhanced space for rest, recovery, and nutrition.  Because the original training campus was designed so well, these upgrades focused on expanding communal areas so that players could spend more time together off the field-developing the feeling of a “team”.

Arizona Cardinals PracticIn 2013, one of the three natural grass fields at the facility was converted to synthetic turf and enclosed within a climate controlled, an air-supported structure named “the bubble”.  The team saw a need for a field that was playable in all weather and that required minimal maintenance while extending playing hours.  This is especially important throughout annual training camps where players spend entire days practicing and training.  The turf selected is now a branch of Act Global as is recognized within the industry for its safety and performance to help protect against high impacts.

Learn how our synthetic turf is beneficial to athletes. 

Be sure to keep up to date on all of our turf projects and more by following us on FacebookTwitterInstagram, and LinkedIn.